LATEST CENTRAL GOVERNMENT WORKERS (EMPLOYEES) NEWS

CG WORKERS NEWS

Search This Blog

Agenda Items For NAC Meeting : Bunching Of Steps In The Revised Pay Structure

with 0 Comment
Agenda Items for NAC Meeting : Bunching of steps in the Revised Pay structure

Item 9: Bunching of steps in the Revised Pay structure

In para 5.1.36, the 7 CPC envisaged that

“Although the rationalisation has been done with utmost care to ensure minimum bunching at most levels, however if situation does arise whenever more than two stages are bunched together, one additional increment equal to 3 percent may be given for every two stages bunched, and pay fixed fixed in the subsequent cell in the pay matrix”.

To give effect to the recommendations, orders were issued vide No. 1-6/2016-IC dated 7.9.2016 by the Deptt of Expr-IC.
In consonance with the recommendation, the said order stipulated that officers drawing pay where the difference is less than 3% shall not be entitled for this benefit.

However vide order No 1-6/2016-IC dated 03.08.2017, DOE, IC issued a clarification which was virtually to wipe off the benefit to a large number of employees. They placed 4 (four) conditions for the grant of Bunching benefit as under.

i) Benefit on account of bunching is to be extended when two or more stages get bunched.

ii) Benefit of one increment is to be extended on account of bunching of every two consecutive stages.

iii) As stipulated in MoF OM dated 07.09.2016, a difference of 3% to be reckoned for determination of consecutive pay stages, specific to each employee.

iv) All pay stages lower than the Entry pay in the 6th CPC pay structure indicated in the Pay Matrix contained in the 7th cpc Report are not to be taken into account for determining the extent of bunching.

Condition No (iv) has been incorporated as an afterthought it must be constructed as one contradictory to the very intention expressed in clear terms by the Commission.

The Staff Side demands that the condition No (iv) in the order cited may be deleted so as to provide the benefit of Bunching to all deserving employees.


Agenda Item No 1: Anomaly in computation of Minimum Wage

Agenda Item No 2: 3% Increment at all stages

Agenda Item No 3: Removal of condition of 3% stipulated to grant bunching benefit

Agenda Item No 4: Fixation of Pay on Promotion

Agenda Item No 5: Removal of Anomaly in Pay Matrix

Agenda Item No 6: Anomaly due to index rationalization

Agenda Item No 7: Anomaly arising from the decision to reject option No.1 in pension fixation

Agenda Item No 8: Lesser Pay in higher Level of Pay Matrix

Agenda Item No 9: Bunching of steps in the Revised Pay structure

Agenda Item No 10: Minimum Pension

Agenda Item No 11: Date of Effect of Allowances – HRA, Transport Allowance, CEA etc.

Agenda Item No 12: Parity in Pay Scale between Sr Auditor/Sr Accountant of IA&AD

Agenda Item No 13: Parity in Pay Scales between Assistants/Stenographers

Agenda Item No 14: Grant of GP 5400 to Senior Section Officer of Railways & AAOs of IA&AD

Agenda Item No 15: Technical Supervisors of Railways

0 comments:

Post a Comment

Recent Links

Featured post

GDS Pay and Arrears Calculator (Updated June 2018)

GDS Pay and Arrears Calculator (Updated June 2018) Gramin Dak Sevaks Matrix Wage Arrears Calculator as per Cabinet Decision taken on 6....

TRENDING

Blog Archive

Total Pageviews